Thursday 19 July 2012

Bathroom day 11

Today we had the heating system powerflushed by British Gas and the guys checked over the shower. It's failure to work yesterday was blamed on an "air lock"
Time to wait and see I think.
The British Gas guy left us a glass of clean water from our clean system. Nice touch!

Bathroom day 10

All done, except paint and trim. But shower is not working. Plumber coming back.
Extractor fan installed.
Black grout has marked the walls but that will paint over.





Tuesday 17 July 2012

Bathroom day 9

Today the toilet and sink install was done. Tiling and shower screen to do.




Sunday 15 July 2012

Bathroom day 8

Cloakroom pretty much done.
Bath working. Toilet, sink, and shower to go.




Thursday 12 July 2012

Bathroom day 7

Today saw the tiling, towel warmer, and basics in the bathroom. The cloakroom is nearly done.






Wednesday 11 July 2012

Day 6 of bathroom works

Today the cloakroom floor went down, and the sink went in.
The bath is in place upstairs.
Most of the lights are in place.
Shaver socket done.
A bit nervous now... Are we running out of time for the bathroom finished for Friday?






Tuesday 10 July 2012

Day 5 of bathroom fit

Today we got plastered.
Ready for unit fit tomorrow.
British Gas called. They are coming to check the power flush next Tuesday.




Monday 9 July 2012

Day 4 of bathroom fit

Old towel rail defunct.
Prepared for plastering.





Saturday 7 July 2012

Day 3

Bees or wasps in the attic. Pipe work tidied up.


Thursday 5 July 2012

Day 2 air locks and sludge

Plumbing work... Air locks and sludge in the radiators when they were disconnected. Looks like British Gas didn't power flush the system last year as they said they had, so we have to complain now.



Bathroom day 1

Out with the old...




Tuesday 3 July 2012

Bathroom improvement day -1

We are getting ready for the builder to arrive tomorrow to do the bathroom, cloakroom and chimney. There is a lot to do.